Residential Demolition Permits
The City of Leawood is Only Accepting Electronic Plan Submittals for Building Permits at this time.*
*Permits and Plans can be submitted to CodesAdminGen@leawood.org along with a completed Building Permit Application Form.
If your intention is to rebuild a house upon complete demolition or add on to an existing structure after demolition of an exterior wall, plans must be submitted for reconstruction. Contractors, generals and subs, are required to be licensed with both the City of Leawood and Johnson County. Select this link for more information about Johnson County Contractor Licensing..
If your homes association is participating with the City’s notification process on building permits, there may be up to a twenty five (25) day waiting period before your permit can be issued. Be sure to check with your homes association before beginning any exterior or complete demolition projects.
The information on this web page is also available in the Demolition and Rebuilding of Single Family Dwellings Brochure.
Permits for complete structure demolition are valid for fifteen (15) days. The following information is required to be presented for approval of the demolition permit:
- A site plan, which shows the location of the building or structure to be demolished and any other existing buildings on the property. The plan shall also indicate pedestrian protection, if applicable.
- The location where the demolition debris will be deposited.
- The height and the total square footage of the building.
- Evidence of required street closure permit, if applicable.
- The name and address of the owner of the building.
- The type of equipment or method used to demolish the building.
- Evidence that all public utilities have been disconnected.
- Proof of rat-abating of any building at least ten days before the demolition, if applicable.
- Proof of permission from the owner to demolish the building.
- Evidence that proper erosion control will be provided for the site during demolition as well as during seeding and final grading of site.
- Should the site not be redeveloped, a site plan, which indicates proposed grading and seeding.
- If the site is to be redeveloped, plans for the redevelopment must be submitted prior to the issuance of the demolition permit.
The following information is required to be presented for approval of a complete structure demolition permit.
- A site plan, which shows the location of the building or structure to be demolished and any other existing buildings on the property. The plan shall also indicate pedestrian protection, if applicable.
- The location where the demolition debris will be deposited.
- The height and the total square footage of the building.
- Evidence of required street closure permit, if applicable.
- The name and address of the owner of the building.
- The type of equipment or method used to demolish the building.
- Evidence that all public utilities have been disconnected.
- Proof of rat-abating of any building at least ten days before the demolition, if applicable.
- Proof of permission from the owner to demolish the building.
- Evidence that proper erosion control will be provided for the site during demolition as well as during seeding and final grading of site.
- Should the site not be redeveloped, a site plan, which indicates proposed grading and seeding.
- If the site is to be redeveloped, plans for the redevelopment must be submitted prior to the issuance of the demolition permit.
Permits for partial structure demolition are valid for thirty (30) days. The following information is required to be presented for approval of a partial structure demolition permit:
- Identify and describe the work to be covered by the permit for which application is made.
- Describe the land on which the proposed work is to be done by legal description, street address or similar description that will readily identify and definitely locate the proposed building or work.
- Indicate the use and occupancy for which the proposed work is intended.
- Be accompanied by construction documents and other information as required by building official.
- State the valuation of the proposed work.
- Be signed by the applicant, or the applicant’s authorized agent.
- Give such other data and information as required by the building official.
- Said permit will be issued in conjunction with permit for proposed new construction. Permits for interior demolition are valid for thirty (30) days.
The following information is required to be presented for approval of an interior demolition permit:
- Identify and describe the work to be covered by the permit for which application is made.
- Describe the land on which the proposed work is to be done by legal description, street address or similar description that will readily identify and definitely locate the proposed building or work.
- Indicate the use and occupancy for which the proposed work is intended.
- Be accompanied by construction documents and other information as required by building official.
- State the valuation of the proposed work.
- Be signed by the applicant, or the applicant’s authorized agent.
- Give such other data and information as required by the building official.
- Said permit will be issued in conjunction with permit for proposed new construction.